Thursday 28 November 2013

PROJECT 6 : AMPHITHEATRE STAGE



This is also group work project and include the 7 discipline is architecture, interior design, urban planning, building surveying, building technology, quantity surveying and construction manager..
We all combined to work together for a team to complete this project..
Each discipline have their own work..

This project need to be combined of key plan, location plan. site plan, site analysis, concept, bubble diagram, plan and elevation drawing, perspective drawing, and detail drawing on the 3 A1 paper...

The project also include the report for progress of the working and the report also include time for finished this project and make the proposal to propose facilities..


The first A1 paper include the key plan, usm plan, location plan, site analysis and site analysis...



The second A1 paper included plan, elevation and section drawing scale  1 : 50 and for floor plan is 1 : 100...



The last A1 paper included the detail drawing, bubble diagram, perspective drawing and design concept..

The design concept for our amphitheatre stage is from the turtle..
This is because at the back of our stage have a sea can feel the environment of the scenery and also have the meaning why we choose the turtle..

The meaning can live a long time and it symbolizes strength..
And for our model it symbolizes strongest structure..











1 comment:

  1. Lovely work! Could you please tell me how you managed to colour the sheets Soo well? Which colours do you use?

    ReplyDelete