Thursday 26 December 2013

PROJECT 8 : PERFORMANCE NIGHT & AWARD


We all need to make a performance according our own major such as dancing,singing, acting and so on for this last project in first semester and our last memory in RUS104 studio. The theme for this performance and award night is "THE LOST KINGDOMS" that were chosen by our studiomaster and commitee members. Each major have to represent the specific  "LOST KINGDOMS" as follow:

Building Surveying - Pagaruyung 
Quantity Surveying - Majapahit
Building Technology - Mataram
Construction Management - Demak
Interior Design - Singhasari
Planning - Langkasuka
Architecture - Srivijaya




I was the committee and my picture not much taken for this performance night..
this is my picture with Prom King for that night and with other committee member...

PROJECT 7 : EXHIBITION


For this project , we need to set-up booth according to our own courses which is Architecture, Quantity Surveying, Building Surveying, Interior design, Construction Management, Building Technology and also Urban regional and planning. We need to display our best project from project 1 to project 6. We need to follow the theme which is THE FLOATING LINES....




Thursday 28 November 2013

PROJECT 6 : AMPHITHEATRE STAGE



This is also group work project and include the 7 discipline is architecture, interior design, urban planning, building surveying, building technology, quantity surveying and construction manager..
We all combined to work together for a team to complete this project..
Each discipline have their own work..

This project need to be combined of key plan, location plan. site plan, site analysis, concept, bubble diagram, plan and elevation drawing, perspective drawing, and detail drawing on the 3 A1 paper...

The project also include the report for progress of the working and the report also include time for finished this project and make the proposal to propose facilities..


The first A1 paper include the key plan, usm plan, location plan, site analysis and site analysis...



The second A1 paper included plan, elevation and section drawing scale  1 : 50 and for floor plan is 1 : 100...



The last A1 paper included the detail drawing, bubble diagram, perspective drawing and design concept..

The design concept for our amphitheatre stage is from the turtle..
This is because at the back of our stage have a sea can feel the environment of the scenery and also have the meaning why we choose the turtle..

The meaning can live a long time and it symbolizes strength..
And for our model it symbolizes strongest structure..











PROJECT 5 : SENSE OF PLACE ( NEIGHBORHOOD AND COMMUNITY )


For this project we need to visit the site given from our studiomaster....

This is because to do site analysis for this project and drawing on the A2 paper...

Such wind and sun direction, the types of road, the types of building and the facilities that exist there.



This is proposal to propose improvement could be added in that area..

I propose to add the guard house, CCTV, lamp pole, speed bump, playground and vegetation..
 
 This is because can control the safety and for the healthy life to this residential area..



Wednesday 27 November 2013

PROJECT 4B : PRESENTATION DRAWING


The drawing from the project 4A..
Including the Plan and Elevation drawing and also the perspective drawing..
For the plan and elevation drawing easy than on perspective drawing...
 

This is individual work but working in group because the chair we doing together...

My perspective drawing is like children drawing,,
 
So embarrassing....




PROJECT 4A : OBJECTS CONNECTION

This is a group work project..

The group members is Glenn, Siao Ching, Zi Ling also including me..

The idea for doing this chair is from Glenn is the concept of wave...

While making this chair,, our orientation was held ..

We all feel tired with the activity ..

At the same time, I had a fever but I still come to the studio to help other group members to compete it.

Tuesday 26 November 2013

PROJECT 3 : FREE-FORM SCULPTURE

This is my sculpture for my third project....

I choose  for doing this sculpture because I have reason for this..

This is because the sculpture like basket and the meaning of this is accept anything with an open mind and always needed.